Product Details:
Payment & Shipping Terms:
|
Product Name: | Luggage Testing Machine | Power: | Electronic |
---|---|---|---|
Design Criteria: | QB/T 2922-2007 | Damping Spring Constant: | (single) 17.54N / M (± 5%) |
Machine Size: | (L × W × H) 1400 × 1200 × 3250mm | Test Speed: | 10~30 R/min, Adjustable |
Highlight: | Abrasion Resistance Test Machine,Fatigue Testing Machine |
Luggage Oscillation Impact Testing Machine With PLC Control And Pneumatic Control
Touch Screen Suitcase Vibration Impact Machine
1.Hi-Q,Factory outlet
2.Professianl design,fast delivery
3.Reasonal price
Luggage Oscillation Impact Testing Machine With PLC Control
Touch Screen Suitcase Vibration Impact Machine
1.Description:
This tester is used to test the vibration resistance of full unit handle, can be referred to improve product quality.
2.Working principle:
The testing method is to load a certain weight on the specimen, impact it for 2500 times by 30times/minute and 4" distance.
3.Design criteria:
QB/T 2922-2007
4.Technical parameter:
Touch Screen Suitcase Vibration Impact Machine
Item | Parameter |
Control method | PLC control, touch screen |
Metal bracket height | 2500mm; |
Test stroke | 0-150mm adjustable; |
Maximum bearing weight | 50kg |
Vibration mode | The impact device can move up and down, the suction cup noise reduction device, the suction cup has a pneumatic pressure noise reduction device, which can reduce unnecessary vibration of the test piece; |
Damping spring constant | (single) 17.54N / m (± 5%); |
Test speed | 10 ~ 30r / min can be adjusted; |
Recording device | with automatic recording function |
Control method | adjustable test speed, set the number of impact tests, and have an automatic shutdown function when the sample is dropped halfway |
Power system | pneumatic control |
Machine size | (L × W × H) 1400 × 1200 × 3250mm; |
Weight | 250Kg; |
Power supply | 1∮, 220V / 50Hz. |
5.Maintenance:
1, Clean: Clean of machine with cotton fabric before and after usage each time;
2, Anti-rust: Spray anti-rust oil on metal unit of the machine each week (Clean in 2 hours after spraying);
3, Lubricating oil: Add lubricating oilto rotating parts (screw) of machine every month;
Contact Person: Mary